From 6, June, 2016 to 18, August,2017
Main Contractor: ELSEWEDY ELECTRIC-PSP.
Location: Beni Suif – Egypt.
Contractor: EL-soudi for Engineering Works
From 6, June, 2016 to 18, August,2017
Main Contractor: ELSEWEDY ELECTRIC-PSP.
Location: Beni Suif – Egypt.
Contractor: EL-soudi for Engineering Works