From 15, April, 2017 to 30, November,2017
Main Contractor: ELSEWEDY ELECTRIC-PSP.
Location: Beni Suif – Egypt.
Contractor: EL-soudi for Engineering Works
From 15, April, 2017 to 30, November,2017
Main Contractor: ELSEWEDY ELECTRIC-PSP.
Location: Beni Suif – Egypt.
Contractor: EL-soudi for Engineering Works