From 10, November, 2014 to 29, September,2015
Main Contractor: Acciona.
Location: Cairo – Egypt.
Contractor: EL-soudi for Engineering Works
From 10, November, 2014 to 29, September,2015
Main Contractor: Acciona.
Location: Cairo – Egypt.
Contractor: EL-soudi for Engineering Works